Web Analytics Made Easy - StatCounter

Rcc Tunnel Tenders

Get complete information related to latest Rcc Tunnel Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Rcc Tunnel Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Rcc Tunnel Tenders .

Filter
Loading....
Loading....
Loading....
Loading....
Loading....

Bid Submission Date Range
Tender Value

State Government

CTN :40931319 Due date: 16 Jul, 202516 Jul, 2025 2.69 Lacs
Tender For corrigendum : ktps-vii stage - civil - o and m-i - sd-ii - arresting seepage and cc flooring work in the underground tunnel of 4a/b, track hopper and erh in coal handling plant area of ktps stage-vii, paloncha

State Government

CTN :40653995 Due date: 21 Jul, 202521 Jul, 2025 2.03 Crore
Tender For corrigendum : biennial work contract for round the clock cleaning of chp 210 mw consisting of conveyor 21 a/b to 28 a/b including rotary breaker, reject conveyor, belt feeders, tunnel junction towers floors, track hopper . . . . . etc. of 210 mw atps chachai.

State Government

CTN :40984687 Due date: 14 Jul, 202514 Jul, 2025 1.76 Lacs
Tender For annual repair and maintenance of to mdr-67 victory tunnel to sanjauli km 0/00 to 5/120 (sh - p/l plastering work, painting work, rolling shutters etc. in underground passage at near auckland tunnel).

CTN :40994676 Due date: 25 Jul, 202525 Jul, 2025 NA
Tender For operation & manning and maintenance of all e&m related equipments, tunnel ventilation, tunnel lighting, cctv, pa, sos/ip phones, scada, and fire fighting system etc. for tunnel t-43, t-44, t-49, t-50, t-51, t-52, t-53, t-54 & t-55, sangaldan- tcc, khari-tcc, & banihal -tcc, indoor and outdoor electrification of khari and sumbur station building work for 01 year in the dharam-banihal section of udhampur-srinagar- baramulla rail link project, jammu & kashmir

CTN :40968127 Due date: 26 Jul, 202526 Jul, 2025 NA
Tender For operation & manning and maintenance of all e&m related equipments, tunnel ventilation, tunnel lighting, cctv, pa, sos/ip phones, scada, and fire fighting system etc. for tunnel t-43, t-44, t-49, t-50, t-51, t-52, t-53, t-54 & t-55, sangaldan- tcc, khari-tcc, & banihal -tcc, indoor and outdoor electrification of khari and sumbur station building work for 01 year in the dharam-banihal section of udhampur-srinagar- baramulla rail link project, jammu & kashmir

State Government

CTN :40967043 Due date: 23 Jul, 202523 Jul, 2025 262.88 Crore
Tender For conducting detailed topographical survey, investigation, preparation of designs drawings and construction of distributary canal network comprising of minors, sub minors and laterals and sub laterals including lining and structures under distributary no-32 offtaking at ch.28.350 km of varahi left bank canal to provide irrigation facility to 1353.31 ha of irrigable command area including construction of under tunnel, troughs, aqueducts, railway crossing and other cd works in kundapura taluk of udupi district including operation and maintenance of the entire canal network for a period of five years after satisfactorily completion of the work on turn key basis.

Central Government/Public Sector

CTN :40962135 Due date: 25 Jul, 202525 Jul, 2025 NA
Tender For custom bid for services - farm filed and operation job contract -1a. field/farm job work for the period 01.09.2025 to 31.08.2026 67160 man hours/12 months= 23 points- wetting of saw dust 6 qtls. mixing bag filling, autoclaving,, spawning, shifting bags to incubation room, composting yard,, spwan unit, incubation room, wetting wheat straw 8 qtls., mixing, filling in tunnel,, spawning of oyster and milky mushroom, shifting to, incubation room, composting yard,, spawning area, wetting wheat straw 3 ton, mixing ingredients, stack, formation, mixing ingredients on alternative day and filling, in tunnel, phase-ii composting, -dowetting of saw dust 6 qtls. mixing bag filling, autoclaving,, spawning, shifting bags to incubation room, composting yard,, spwan unit &, incubation room, wetting wheat straw 8 qtls., mixing, filling in tunnel,, spawning of oyster and milky mushroom, shifting to, incubation room, composting yard,, spawning area, wetting wheat straw 3 ton, mixing ingredients, stack, formation, mixing ingredients on alternative day and filling, in tunnel, phase-ii composting and continuation of, experiments of previous month, -dospawning of button mushroom compost, shifting bags to, incubation rooms, media preparation, cotton plugging., spawning area, and cropping, rooms, maintaining of cropping room condition, 13 rooms (12x16), like watering, cleaning, casing., -, harvesting, removal of used bags, preparation of casing,, casing of bags, cropping rooms, used bags emptying in pits, collection of used bags,, washing and treatment for empty rooms., -dowetting of cotton ginning mill waste (4 qtls.), mixing of, ingredients, stacking, turning, filling in tunnel, spawning,, plastic sheet covering, room cleaning, dusting of office and, labs etc., composting yard, wetting of wheat straw (4 qtls.) for milky and oyster, mushroom (3 qtls.) filling in tunnel, spawning, casing,, harvesting, watering, etc., composting yard, and cropping, room, daily watering in 13 cropping rooms, harvesting and, cleaning of cropping rooms, cropping rooms, removal of used bags, cleaning of rooms, disposing in, pits,, cropping rooms, and nearby area, substrate wetting (4 qtls.) of paddy straw mushroom,, mixing of ingredients, pile making, turning and filling in, tunnel, composting yard, wetting of wheat straw (4 tonnes) mixing ingredients,, shifting of tunnel, spawning, casing and watering,, harvesting, etc., cropping room, wetting saw dust, mixing wheat bran, filling in bags,, autoclaving, spawning, shifting to incubation rooms,, watering, cleaning, composting yard, watering in cropping rooms, cleaning, casing, filling,, packing, pesticide spraying, media preparation, millipore, water., cropping rooms, wetting of wheat straw (2 tonnes), stacking, turning, filling, in tunnel, spawning, bag filling, shifting to incubation room,, casing, watering, harvesting, etc. and continuation of, experiments of previous month, composting yard, and cropping, rooms, wetting wheat straw (4 qtls.) for oyster mushroom, mixing,, filling in tunnel, spawning, bag removal, watering,, harvesting, cleaning of rooms, etc., -dowetting saw dust (3 qtls.) mixing, autoclaving, spawning,, shifting to incubation room, etc., -docasing material preparation, tunneling, casing, watering,, digging pits, etc., -dowetting saw dust, mixing wheat bran, filling in bags,, autoclaving, spawning, shifting to incubation rooms,, watering, cleaning, -dowetting 6 qtls. of saw dust for shiitake and agrocybe,, mixing, filling in bags, autoclaving, spawning, shifting to, incubation rooms, etc., composting yard, wetting 6 qtls. wheat straw, mixing ingredients, turning,, inserting pvc pipes, covering with sheet, spawning,, shifting bags to incubation rooms,, -domaintaining cropping rooms, watering, cleaning, etc. cropping room, casing mixture preparation, sieving, filling in tunnel, casing, on spawn run bags, watering, -doharvesting, re-casing, watering, cleaning, etc. cropping rooms, wetting of wheat straw (4

State Government

CTN :40949599 Due date: 18 Jul, 202518 Jul, 2025 1.40 Lacs
Tender For work of cleaning and removal of naturally deposited materials from monsoon drains of control rooms and machine hall premises and cleaning and removal silt from fire tank, seepage water collection tank in escape tunnel an silt arrester tanks at phps

Central Government And Public Sector

CTN :40949846 Due date: 08 Aug, 202508 Aug, 2025 5.45 Crore
Tender For construction of rcc tunnels, precast pedestals for llw pipe line in frfcf and bhavini premises and other associated works at kalpakkam

CTN :38419604 Due date: 01 Aug, 202501 Aug, 2025 NA
Tender For corrigendum : construction of underground power house building, tail race tunnel, switch yard and other associated work of power house site, adits , mat, vertical pressure shaft & steel liner including branch tunnel & associated project roads
 Loading, Please wait...

Connect us via What's Up